Water
Solaire Resort – Sewage Treatment Plant Upgrade
Location
Paranaque City, Metro Manila, Philippines
Value
Over Php 290 million
Client
Sureste Properties, Inc.
Status
Completed
About the project
PrimeBMD was engaged as the general contractor for the design and construction for the upgrade, expansion, and refurbishment of the existing Phase 1 and Phase 1A Sewage Treatment Plants in Solaire Resort and Casino. The upgraded STPs adopted the Sequencing Batch Reactor (SBR) nitrification-denitrification activated sludge technology and were designed to provide total treatment capacity of 1,200 m3/day for Phase 1 and 2, 180 m3/day for Phase 1A, respectively.