Water

Upper Wawa Pumping Station

Location
Antipolo, Rizal, Philippines
Value
Over Php3 billion
Client
Wawa JV Co.
Status
Ongoing
viber_image_2025-05-08_16-21-38-683

About the project

The Upper Wawa Pumping Station project was initiated by Wawa JVCo. Inc. as a major part of their infrastructure project. PrimeBMD’s major scope includes the design and construction of a pumping station with a capacity of 518 MLD (additional standby capacity of 259 MLD), 1,016.5 meters access tunnel, a 72.1-meter-deep shaft for the pumping station and 1,988.49 meters conveyance pipeline.

viber_image_2025-05-08_16-21-46-408
viber_image_2025-05-08_16-21-45-515
viber_image_2025-05-08_16-21-41-186
h-03

Project scope

Design and construction of a pumping station with a capacity of 518 MLD from normal operation and an additional backup/standby capacity of 259 MLD.

Design and installation of water conveyance pipeline of approximately 1,988.49m.

Design and construction of permanent access road of approximately 2470 m length from the CWTP interface point to the pumping station along the water conveyance pipeline.

Design and construction of 1,016.51m long Access Tunnel to the Pumping Station of a sufficient cross section to provide access during construction as well as for permanent access for the purposes of operation and maintenance of the Pump Station.